<?xml version="1.0" encoding="utf-8"?>
<!DOCTYPE ead PUBLIC "+//ISBN 1-931666-00-8//DTD ead.dtd (Encoded Archival Description (EAD) Version 2002)//EN" "http://lcweb2.loc.gov/xmlcommon/dtds/ead2002/ead.dtd">
<ead>
  <eadheader langencoding="iso639-2b" countryencoding="iso3166-1" dateencoding="iso8601" repositoryencoding="iso15511" scriptencoding="iso15924" relatedencoding="DC">
    <eadid identifier="jim-dufour" mainagencycode="ON00120" url="https://analyst.connor.atom.accesstomemory.net/jim-dufour" encodinganalog="identifier">019</eadid>
    <filedesc>
      <titlestmt>
        <titleproper encodinganalog="title">Jim Dufour</titleproper>
      </titlestmt>
      <publicationstmt>
        <publisher encodinganalog="publisher">Archives de la Ville du Grand Sudbury</publisher>
        <address>
          <addressline>5 Lindsley Street</addressline>
          <addressline>P0M 1S0</addressline>
          <addressline>Téléphone : 705-688-3965</addressline>
          <addressline>Fax : 705-699-1919</addressline>
          <addressline>Courriel : archives@greatersudbury.ca</addressline>
        </address>
        <date normal="2012-07-11" encodinganalog="date">2012-07-11</date>
      </publicationstmt>
    </filedesc>
    <profiledesc>
      <creation>
      Générer par Access to Memory (AtoM) 2.10.1      <date normal="2026-06-10">2026-06-10 22:03 UTC</date>
    </creation>
      <langusage>
        <language langcode="fre">français</language>
      </langusage>
    </profiledesc>
  </eadheader>
  <archdesc level="fonds" relatedencoding="isad">
    <did>
      <unittitle encodinganalog="3.1.2">Jim Dufour</unittitle>
      <unitid encodinganalog="3.1.1" repositorycode="ON00120">019</unitid>
      <unitdate id="atom_80264_event" normal="1916/1916" encodinganalog="3.1.3">ca. 1916</unitdate>
      <physdesc encodinganalog="3.1.5">
        1 VHS Tape    </physdesc>
      <repository>
        <corpname>Archives de la Ville du Grand Sudbury</corpname>
        <address>
          <addressline>5 Lindsley Street</addressline>
          <addressline>P0M 1S0</addressline>
          <addressline>Téléphone : 705-688-3965</addressline>
          <addressline>Fax : 705-699-1919</addressline>
          <addressline>Courriel : archives@greatersudbury.ca</addressline>
        </address>
      </repository>
      <origination encodinganalog="3.2.1">
        <persname id="atom_80264_actor">Dufour, Jim</persname>
      </origination>
    </did>
    <bioghist id="md5-eb12a4f28b0e43ed3a3a37e00014e982" encodinganalog="3.2.2">
      <note>
        <p>Jim Dufour was born in Thunder Bay, Ontario in 1945.  He moved to Sudbury for work at INCO in 1964 at the Copper Cliff Iron Ore Plant.  After a year in Copper Cliff, Dufour was moved to Stobie Mine where he worked for the next 34 years.  At Stobie, Dufour performed a variety of tasks over the years including working underground.  For the last 15 years of his career, Dufour was responsible for scheduling and training miners at Stobie.  He co-ordinated the instuctors for training new employees on the history of mining, terminology, current practices, and safety.  After 35 years at INCO, Jim Dufour retired in 1999.</p>
      </note>
    </bioghist>
    <odd type="publicationStatus">
      <p>publié</p>
    </odd>
    <odd type="titleSource">
      <p>Title based on the content of the fonds.</p>
    </odd>
    <scopecontent encodinganalog="3.3.1">
      <p>This fonds consists of one VHS copy of a Mond Nickel film, originally recorded on 16mm film.</p>
    </scopecontent>
    <controlaccess>
      <persname role="Producteur" id="atom_80264_actor">Dufour, Jim</persname>
      <corpname role="subject">Mond Nickel</corpname>
      <geogname>Sudbury, Greater</geogname>
    </controlaccess>
    <acqinfo encodinganalog="3.2.4">
      <p>ACC2011-019, Jim Dufour</p>
    </acqinfo>
    <accruals encodinganalog="3.3.3">
      <p>Further accruals are expected.</p>
    </accruals>
    <otherfindaid encodinganalog="3.4.5">
      <p>Item list available.</p>
    </otherfindaid>
    <dsc type="combined">
      <c level="file">
        <did>
          <unittitle encodinganalog="3.1.2">The Mining and Smelting of Canadian Nickel</unittitle>
          <unitid encodinganalog="3.1.1" repositorycode="ON00120">1</unitid>
          <unitdate normal="1916/1916" encodinganalog="3.1.3">Transferred to VHS before 1999 (original ca. 1916)</unitdate>
          <physdesc encodinganalog="3.1.5">
        1 VHS Tape    </physdesc>
          <langmaterial encodinganalog="3.4.3">
            <language langcode="eng">anglais</language>
          </langmaterial>
          <note type="generalNote">
            <p>Video was originally on 16mm film and was transferred to VHS by Jim Durfour.  The 16mm film the copy was made from was then distroyed.</p>
          </note>
        </did>
        <odd type="publicationStatus">
          <p>publié</p>
        </odd>
        <scopecontent encodinganalog="3.3.1">
          <p>One silent film of Mond Nickel mines in the Sudbury area.  Film is divided up into the following sections by title cards (time each card appears in the film is noted before each title card caption);<lb/><lb/>Part I<lb/><lb/>00:00 – The Mining and Smelting of Canadian Nickel, Mond Nickel Company, Coniston, Ontario, Canada<lb/>00:08– Nature’s Storehouse and the Company Mines<lb/>01:24– Diamond drilling to determine location and extent of ore body<lb/>02:01– A Typical Nickel Mine<lb/>02:12– Let us go down into the mine and see how Nickel Ore is obtained<lb/>02:57– We will follow the car through passages called “Drifts” far below the surface<lb/>04:14–The end of the drift. Drill runners preparing a blast to extend the drift to reach new work<lb/>05:24– With compressed air force and great noise the sharp edges cut into the ore while a stream of water pours through the hole to keep the drill cool<lb/>06:23- Dynamite handle with care<lb/>06:31– Fuses eight feet long burn four minutes. Detonating cap being placed on end of fuse<lb/>06:41– The cap is inserted in the charge of dynamite<lb/>07:02– Ten or twelve holes are made from four to ten feet deep in a surface of five square yards<lb/>07:21– One stick of dynamite is placed in each hole for every foot of depth, about 30 lbs. in all, the last stick in each hole has a fuse attached<lb/>08:30– We didn’t wait to see what happened, but this was the result<lb/>09:15– When main development drift is finished the ore above on each side is measured into sections called stopes, 100 feet wide, 100 feet high and as deep as the ore runs, leaving a pillar of solid ore 40 feet thick between the stopes as a brace<lb/>09:43– Each stope is mined as a unit – Sub drifts run from main development drift under each stope. Draw holes are run up at 45 degrees from the drift to develop the stope and draw out the ore<lb/>09:57– Each stope has several draw holes from twenty-five to thirty-five feet apart – a draw hole viewed from the drift<lb/>10:22– Let us follow the miner into the stope<lb/>10:42– Here a stoping gallery is made 8 feet high and full size of stope. The roof or hanging wall at the high side is cut horizontally and broken down forming a perpendicular face which is carried, blast after blast, the full length of the stope<lb/>11:02– These blasts are fired by electricity<lb/>11:17– Section after section layers eight feet thick are blasted from the roof and broken up on the floor. Lumps too big to be broken up with hammers are broken with a small dynamite blast. Blasting large lumps<lb/>12:16– One third of ore is removed, two thirds are left on floor to stand on in reaching the hanging wall when blasting down the next layer<lb/>12:33– This operation is repeated to within ten feet of the floor of the next level above. When all the draw holes are closed, the miners enter and leave by “rises” from the drifts above<lb/>12:50– Miners going up out of a stope through a rise. These rises serve also as auxiliary shafts in case of fire or closing of mine shaft<lb/>13:22– When all the ore in the stope is blasted down and broken up, the drawholes underneath are opened and the ore removed<lb/>14:39-This – the cheapest and safest method of Copper Nickel mining is followed in 90% of Mond Nickel Co. operations – 100,000 tons of ore are stored in this way at one time<lb/>14:59– Diagram of overhand stope mining method<lb/>15:23– In the underhand method of mining, one draw hole is made at 45 degrees through the stope – then a working gallery is made at the top of the stope. The ore is mined and blasted downward through the draw hole and removed at once. Scene in an underhand stope<lb/>15:55– In ever widening series of ledges like a great funnel this ore is mined and removed<lb/>16:09– Men with scaling ladders constantly inspect the walls of partially emptied stopes to remove dangerous loose pieces of ore<lb/>16:59– The skip may be loaded direct from cars on main drift – cars hold two tons – two cars fill the skip<lb/>17:44– It is not always convenient to load skips at each level. Ore may be passed down through storage pockets to a suitable loading level far below<lb/>18:09– The grating over the passage to lower level is called a grizzly and is for protection of men. This ore goes direct to loading pocket, a great bin cut 50 feet deep in the rock<lb/>18:26– From the main drift above loading level, ore is passed from cars through grizzly to loading bin<lb/>18:50– The ore is measured into skip loads weighing four tons. The skip weighs three tons<lb/>19:36– A waste dump on each level where rock is loaded direct into skip<lb/>19:55– Drills dull very quickly and must be taken up to be sharpened<lb/>20:20– Ladders as well as the skip run to the lowest level<lb/>20:31– Telephones furnish communication between the drifts and the offices above<lb/>20:59– The end of the shift. All aboard for daylight<lb/>22:11– Safety switch on operator’s bridge stops all motion instantly in case of accident or danger<lb/>22:33– Compensating balance of the two skips and cable<lb/>22:45– Skips carrying ore go direct to top of shaft house<lb/>23:20– On next floor below ore and rock is separated – both pass through crushers and are broken up<lb/>23:49– From crushers the waste rock goes direct to bins over railway cars. Ore goes through a revolving screen which sifts out the “fines”<lb/>24:13– On the picking belts, waste rock, low grade ore and high grade ore are separated<lb/>24:32– Waste rock, fines, low grade ore and high grade ore are being loaded into cars from bins<lb/>25:01– Let us inspect the equipment above ground before following the ore to the smelter<lb/>25:10– Power used throughout the mines, smelter and town sites is Hydro-Electric generated at the Company’s own development plants and transmitted over 72 miles of line. Wabagashik – the Company’s first power development<lb/>25:56– Seventy feet of head, developing 5,000 Horse Power<lb/>26:33– Two horizontal twin turbines develop 1250 H.P. each<lb/><lb/>Part II<lb/><lb/>00:00– Nairn Falls, four miles from Wabagashik, capable of developing 7,200 Horse Power<lb/>00:45– Two single runner vertical turbines develop 2,400 H.P. each<lb/>01:12– The power lines – 44,000 volts leaving power house<lb/>01:42– At mines, power is transformed to 500 and 110 volts for service – Transformer station at mines<lb/>02:03– Three compressors supply 7,700 cubic feet of air per minute to pumps, air cranes, forges, skip brakes and 80 miner’s drills<lb/>02:44– Sharpening ore drills. Clearing water passage and retempering<lb/>03:35– The repair shops at the mine<lb/>03:48– The dynamite house is far removed from other buildings, only 24 hours supply kept on hand<lb/>04:09– Dynamite freezes at 40 degrees and must be thawed out<lb/>04:22– The store house and mine offices. A “shift” is checking in<lb/>04:32– A well equipped emergency hospital for first aid<lb/>04:47– The dry house. Hot air below – ventilation above – Clothes are dry when needed again<lb/>05:31– Homeward bound – clean and happy<lb/>05:49– At Levack mine connections with main line C.P.R. four miles distant is made over the Mond Nickel Co’s own right of way and equipment<lb/>06:10– “Old Reliable” the Mond Mine at Victoria, 3,000 feet deep – the deepest mine in Canada<lb/>06:52– Worthington Mine<lb/>07:06– Garson Mine has ten levels and is the greatest producer<lb/>08:01– Bruce Mine supplies 50 tons of quartz daily for smelting purposes, and pays its way by the Copper produced<lb/>08:22– The ore from all the mines is brought to Coniston, Ont. for smelting<lb/>09:21– All material is brought into smelter and moved from process to process in car load lots over standard gauge in Railway or the Company’s own cars by the Company’s own motive power. Ore train arriving from the Mines<lb/>10:01– All material entering smelter is weighed and taken to storage bins at smelter or to storage yard. High grade ore on the scales<lb/>10:39– Unloading high grade green ore at the storage yard<lb/>11:15– The Storage Yard<lb/>11:53– From the scales the green ore may be taken direct to smelter storage bins<lb/>12:16– Ore having as low as 15 to 20 pounds of Copper Nickel to the ton and formerly rejected, is now separated by a system of oil flotation. Low grade ore is first taken to the rock house and broken up<lb/>13:01– The flotation mill where low grade ore passes through a series of processes to secure the small amount of valuable metal<lb/>13:24– Here the ore is ground as fine as meal between rolls and screened<lb/>13:53– The oversize returns to the mill. The fine is mixed with water in a feeder<lb/>14:11– The concentrating tables make the first reparation of metal from dross. The concentration or valuable ore pass over and – the dross is watched over the ride.<lb/>14:37—The concentration pass to the settling tanks. The rejected ore is carried into a tube mill and ground very fine.<lb/>15:02—Very fine ore is carried to first floatation unit, oil, and sulphuric acid are added, and the mixture churned into froth.<lb/>15:20—The valuable ore is coated by the oil and floats to the surface into bubbles.<lb/>15:36—The remaining ore settles to the bottom and is drown into second unit where it is again churned up and the concentrates removed.<lb/>15:54—This process is followed through ten similar units. Finally, the middlings are returned to the head of the system—tailings go to dump.<lb/>16:18—Concentrates are sent to settling tank where ore gravitates to bottom—water overflows into receiving trough<lb/>16:42— these concentrates also fine green ore from the mines and valuable flue dust from the blast furnaces are fused together in sintering plant.<lb/>16:58—Cars of concentrates, fine ore and flue dust are emptied into bins at top of sintering plant.<lb/>17:24—Gates measure correct quantities onto endless belt carriers.<lb/>17:55—Seperated into two streams – one for each sintering machine<lb/>18:16—loading the sintering machine – coarse grain on bottom, fine on top<lb/>18:36—an oil blast is forced through the sinter to fire box below causing incipient fusion of all particles together and removing 15% of the sulphur<lb/>19:40— The fusion or sponge like formation binds the particles together yet allows free action of furnace blast increasing the furnace capacity for green ore<lb/>20:13— The sinter is taken to smelter storage bins<lb/>20:18—Loading high grade green ore, sinter, coke and limestone onto furnace charging cars at bottom of storage bins.<lb/>21:01—Charging one of the four great furnaces each unit with capacity of 750 tons daily, 4 ½ % metal value. This process is constant.<lb/>22:31—Lower section of blast furnaces and water jackets.<lb/>22:42: Air pressure pipes—exhausts stack—and passage way from storage bins to smelter.<lb/>23:01—22 tons of valuable ore dust is collected in these flue bins daily.<lb/>23:20—Flowing at a temperature of 900 to 1050 degrees molten medal is constantly pouring into settler.<lb/>23:43—The Settler. The limestone added in furnace charge has heated the iron and rock making it fluid, being lighter this dross rises to the surface in settler and constantly pours off in the form of slag.<lb/>24:22—Slag pots, each holding 40 tons being emptied on the slag dump.<lb/>25:47—Over 1000 tons of slag are added to this dump every day<lb/>26:13—Let us return to the settler. The ore enters the settler—4 ½ % nickel copper from the furnaces. The iron and rock flow off the top as slag.<lb/>26:30—The nickel, copper, and some iron gravitate to the bottom and are drawn off at intervals in great ladles. This furnace matte is 16% nickel copper.<lb/>27:07—Lifting fifteen tons of molten metal from settler to the magnesite brick lined converters.<lb/>27:46—To this molten mass is added silica quartz from Bruce Mine as a flux.<lb/>28:02— Adding oxygen under 12lbs, pressure, the iron is Bessemerized at a temperature of 950 to 1100 degrees<lb/>28:26—The iron slag is drawn off at intervals and returned to settler where any remaining nickel copper gravitates to bottom<lb/>28:50—As ore and quarts are added and slag drawn off, nickel copper deposit gradually rises in convertor to 45 or 50 ton weight when 80% copper nickel called 80% Bessemer Matte is drawn off and poured into moulds.<lb/>30:16—Cooling – Breaking – Crushing Matte<lb/>31:00 – Measuring –weighing – barreling matte for shipment<lb/>32:29—Ore enroute to seaboard<lb/> 32:45— The smelter equipment. The Power-House, Company’s own Hydro-Electric throughout<lb/>33:14—Six Company locomotives are houses here<lb/>33:37—General view of Company’s well equipped repair shops<lb/>35:12—The store-house where $250,000 worth of stock is kept<lb/>35:21—The laboratory is finally equipped for metallurgic work<lb/>36:34—The Drafting Room<lb/>36:45—The General Offices<lb/>37:02—“All aboard for town”<lb/>37:27—“Coniston” from the hill-top—1200 population—half mile from smelter<lb/>38:14—Bessemer Matte 80% copper-nickel</p>
        </scopecontent>
        <controlaccess>
          <corpname role="subject">Mond Nickel</corpname>
          <genreform>Motion Pictures</genreform>
          <subject>Industries</subject>
          <geogname>Sudbury, Greater</geogname>
        </controlaccess>
        <originalsloc encodinganalog="3.5.1">
          <p>Vale, Toronto, Ontario</p>
        </originalsloc>
        <altformavail encodinganalog="3.5.2">
          <p>This film is also available in DVD format.  Retired INCO miners Jim Dufour and Jack Gingras provided commentary for this silent film in November 2011 to help explain to researchers at the archives what was happening in the film.  This commentary is available on the DVD copy of the film.</p>
        </altformavail>
        <c level="item">
          <did>
            <unittitle encodinganalog="3.1.2">Part I</unittitle>
            <unitid encodinganalog="3.1.1" repositorycode="ON00120">1</unitid>
            <dao linktype="simple" href="https://analyst.connor.atom.accesstomemory.net/uploads/r/city-of-greater-sudbury-archives/8/0/80270/019-1_Part_I.wmv" role="master" actuate="onrequest" show="embed"/>
          </did>
          <odd type="publicationStatus">
            <p>publié</p>
          </odd>
        </c>
        <c level="item">
          <did>
            <unittitle encodinganalog="3.1.2">Part II</unittitle>
            <unitid encodinganalog="3.1.1" repositorycode="ON00120">2</unitid>
            <dao linktype="simple" href="https://analyst.connor.atom.accesstomemory.net/uploads/r/city-of-greater-sudbury-archives/8/0/80271/019-1_Part_II.wmv" role="master" actuate="onrequest" show="embed"/>
          </did>
          <odd type="publicationStatus">
            <p>publié</p>
          </odd>
        </c>
      </c>
    </dsc>
  </archdesc>
</ead>
